NEW QUESTION # 24
Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program.
Which planning strategy do you use?

  • A. Planning with final assembly (40)
  • B. Assembly processing with production orders (82)
  • C. Make-to-stock production (10)
  • D. Planning without final assembly (50)

Answer: C


NEW QUESTION # 25
How would you define a pegging structure for an order in the context of Advanced Planning?

  • A. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between receipt and issue elements
  • B. An evaluation that is ordered according to the low-level codes of all related products and represents the coverage of issue elements with receipt elements and stock
  • C. An evaluation to identify material or capacity shortages in the bill-of-material structure after the production planning run
  • D. An evaluation to identify overstock situations based on the assignment of receipt and issue elements after the production planning run

Answer: A


NEW QUESTION # 26
Which time elements are relevant for lead time scheduling of a production order?
Note: There are 2 correct answers to this question.

  • A. Opening period
  • B. Total replenishment lead time
  • C. Setup time
  • D. Float after production

Answer: C,D


NEW QUESTION # 27
Which of the following are features of the clean core dashboard?
Note: There are 2 correct answers to this question.

  • A. Customers can use the dashboard in the dev, test, and production tenants.
  • B. Customers can grant access to the dashboard to partners.
  • C. It can be accessed by using SAP For Me.
  • D. It can be used in all SAP S/4HANA Cloud editions.

Answer: B,C


NEW QUESTION # 28
Which options do you have to exclude Advanced Planning materials from the standard MRP run in SAP S/4HANA?
Note: There are 2 correct answers to this question.

  • A. Use the material number for selection
  • B. Use a different MRP planner for PP/DS materials
  • C. Use a propagation range
  • D. Use the special MRP type XO

Answer: B,D


NEW QUESTION # 29
What is the purpose of using a low level code?
Note: There are 2 correct answers to this question.

  • A. To determine the priority of alternative components inside the material BOM (bill of material)
  • B. To determine the sequence in which materials are planned in MRP
  • C. To determine the lowest explosion level at which a material occurs in all the product structures
  • D. To determine the use of subitems inside the material BOM (bill of material)

Answer: B,C


NEW QUESTION # 30
You use the Finite Scheduling - with Reverse planning strategy and want to allow scheduling in the past.
How can you parameterize this in the strategy profile?

  • A. Specify a negative PP/DS horizon
  • B. Specify a negative planning horizon
  • C. Specify a negative offset time
  • D. Specify a negative opening period

Answer: C


NEW QUESTION # 31
Which alternative item strategies are available in bills of material (BOMs)?
Note: There are 2 correct answers to this question.

  • A. 100% check
  • B. Manual maintenance
  • C. Simultaneous
  • D. Ranking

Answer: A,B


NEW QUESTION # 32
You want to set up a make-to-order planning scenario for a finished product. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?

  • A. Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator
  • B. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator
  • C. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/Collective indicator
  • D. Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator

Answer: A


NEW QUESTION # 33
What can you use standard heuristics in Advanced Planning (PP/DS) for?

  • A. To set default values in production master data
  • B. To solve planning problems for defined objects
  • C. To optimize costs and times in production plans
  • D. To automate material movements in material staging

Answer: B


NEW QUESTION # 34
What is the purpose of the pull list in material staging?

  • A. To control the flow of material from the production storage location to the central storage location
  • B. To control the flow of material from the supplier to the central storage location
  • C. To control the flow of material from the central storage location to the production storage location
  • D. To control the flow of material from the supplier to the production storage location

Answer: C


NEW QUESTION # 35
Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition?
Note: There are 2 correct answers to this question.

  • A. Work center capacities chart
  • B. Order (pool) chart
  • C. Order (dispatched) chart
  • D. Capacity requirements chart

Answer: A,D


NEW QUESTION # 36
During production order creation, several valid production versions are found.
How does the system choose the production version?

  • A. Lot size or material cost
  • B. Validity period or sales order
  • C. Alphanumeric or quota arrangement
  • D. Planned order or material number

Answer: C


NEW QUESTION # 37
What are some options for creating production orders without using trigger points?
Note: There are 2 correct answers to this question.

  • A. In assembly production, a sales order triggers the creation of a production order
  • B. In make-to-stock production, you can manually create production orders
  • C. In assembly production, confirmation of scrap triggers the creation of a production order
  • D. In make-to-stock production, confirmation of yield for sub-assembly triggers the creation of a production order

Answer: A,B


NEW QUESTION # 38
Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA Cloud Private Edition. When can you use mode selection?

  • A. When several operations are maintained for one product
  • B. When several production versions are maintained for one product
  • C. When multiple planned orders are scheduled in parallel on one resource
  • D. When alternative resources are used within one operation

Answer: D


NEW QUESTION # 39
How can you set up a material as a phantom assembly?
Note: There are 2 correct answers to this question.

  • A. Select a special procurement type inside the material master
  • B. Select a special explosion type inside the material master
  • C. Select a special procurement type inside the material BOM (bill of material)
  • D. Select a special explosion type inside the material BOM (bill of material)

Answer: A,C


NEW QUESTION # 40
Your production planners are supposed to execute planning only for specific resources. What do you use to achieve this in Advanced Planning (PP/DS)?

  • A. A planning group
  • B. A planning area
  • C. A work center hierarchy
  • D. A propagation range

Answer: A


NEW QUESTION # 41
Which time elements does MRP consider in backward scheduling to determine the basic dates for components from dependent requirements? Note: There are 2 correct answers to this question.

  • A. Operation duration
  • B. In-house production time
  • C. Planned delivery time
  • D. Total replenishment lead time

Answer: B,C


NEW QUESTION # 42
How do you assign resources in a master recipe with operations and phases?

  • A. You assign resources to the sub-operations.
  • B. You assign resources to the operations.
  • C. You assign resources to the header of the master recipe.
  • D. You assign resources to the phases.

Answer: B